At first, the underside equipment
must be installed from the corners according to the plan. The mesh should
be supported over the walls which are used as columns of the slabs as
thick as the concrete height, at least. |
![]() |
|
|
|
|
Figure
4 |
|
|
As seen in figure 4. For the meshes to be placed into the beams at both sides, it is more practical to place the mesh by inserting first one side into the beam as much as possible, and than the other side by raising a little the center of the mesh. |
|
|
|
|
|
Figure 5 |
|
|
After installing the underside equipment the steel shoes are faced before installing. The centers of the meshes must be seated to the top of the beams and their sparks to the steel shoes. The distance between the steel shoes is about 1-2 m. By appreciating the rest of the St 1 in the building-sites, the supporting shoes are formed by bending that steel as seen in figure 5. Binding of supporting equipments with wires is not necessary. The carrier wires supporting meshes must be on the upper layer and must be always placed vertically to the support. |
|